22 Sample Mushroom Project Reports — Free to Download
Sample MushroomWale 2026 Bank & EPC edition DPRs, built on our 10 Oct 2026 quotation rates — 18×40, 18×60 and 18×70 ft grow-room farms from 100 kg/day to 2000 kg/day, with and without an on-site compost unit. Each 80-page report carries the BOQ, 5-year P&L, term-loan sizing and DSCR ladder banks ask for.
- Sample project reports
- 22
- Minimum DSCR every loan is sized to
- 1.75×
- Project cost range
- ₹56.26–826.39 L
- Pages per report
- 80
The sample DPR library
Showing 22 of 22 reports.
- Master Portfolio
Master Portfolio — All 21 Project Configurations Compared
The single comparison volume: all 21 MushroomWale project configurations (18×40, 18×60 and 18×70 ft, with 20T/30T compost units or bought-in compost) placed side by side across 65 pages — 42 standard plus automated cases, debt sized to cash flow with a 1.50× internal DSCR floor and nil base subsidy assumed. Start here to pick the model that fits your land, capital and market before opening an individual DPR.
- Scale
- 21 Configurations · Comparative
- Daily output
- 100 – 2000 kg/day
- Annual output
- 38.4 – 720.0 MT/yr
- Compost
- 20T / 30T on-site or bought-in
- Standard cost
- ₹56.26 L – ₹826.39 L
- Term loan
- Sized at 75% CFADS
- Every configuration compared on cost, output, loan and DSCR
- Standard vs Naayom automated case for each model
- Pan-India client-editable scheme draft included
- Best first read before choosing a specific room size
- Without Compost Unit
2 × 18×40 ft — 100 kg/day, Bought-In Compost
Lightest entry model: two 18×40 ft controlled rooms running on externally procured Phase-III compost, so no composting yard is funded. Standard project cost ₹56.26 lakh with a ₹19.0 lakh term loan and 1.84× average DSCR.
- Scale
- 2 Rooms · 18×40 ft
- Daily output
- 100 kg/day
- Annual output
- 38.4 MT/yr
- Compost
- Externally procured
- Standard cost
- ₹56.26 L
- Term loan
- ₹19.0 L
- Lowest capex route — compost bought per cycle
- Below 50 MT/yr: confirm state small-unit scheme component
- Term loan ₹19.0 L, repaid within tenure
- Land, grid connection, DG and transport excluded
- 18×40 ft Series
2 × 18×40 ft + 1 × 20T Compost — 100 kg/day
Self-reliant starter farm: two 18×40 ft rooms plus one 20-tonne compost unit on a 15-day batch rhythm. Standard project cost ₹94.66 lakh (₹99.94 lakh automated) against 38.4 MT saleable output a year.
- Scale
- 2 Rooms · 18×40 ft
- Daily output
- 100 kg/day
- Annual output
- 38.4 MT/yr
- Compost
- 1 × 20 T on-site
- Standard cost
- ₹94.66 L
- Term loan
- ₹35.8 L
- 15-day batch rhythm with staggered cropping plan
- Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
- Term-loan sizing, DSCR ladder and full repayment within tenure
- Below 50 MT/yr: confirm state small/production-unit component
- 18×40 ft Series
4 × 18×40 ft + 1 × 20T Compost — 200 kg/day
Four-room commercial unit fed by one 20-tonne compost bunker, 76.8 MT saleable output a year on a 15-day batch rhythm. Standard project cost ₹127.46 lakh with a ₹70.5 lakh model-selected term loan.
- Scale
- 4 Rooms · 18×40 ft
- Daily output
- 200 kg/day
- Annual output
- 76.8 MT/yr
- Compost
- 1 × 20 T on-site
- Standard cost
- ₹127.46 L
- Term loan
- ₹70.5 L
- 15-day batch rhythm with staggered cropping plan
- Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
- Term-loan sizing, DSCR ladder and full repayment within tenure
- 50–300 MT/yr band: integrated mushroom project-mode eligibility
- 18×40 ft Series
6 × 18×40 ft + 1 × 20T Compost — 300 kg/day
Six rooms on a tighter 10-day filling rhythm sharing one 20-tonne compost unit, giving 115.2 MT a year. Standard project cost ₹161.52 lakh, term loan ₹105.1 lakh, average DSCR 1.84×.
- Scale
- 6 Rooms · 18×40 ft
- Daily output
- 300 kg/day
- Annual output
- 115.2 MT/yr
- Compost
- 1 × 20 T on-site
- Standard cost
- ₹161.52 L
- Term loan
- ₹105.1 L
- 10-day batch rhythm with staggered cropping plan
- Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
- Term-loan sizing, DSCR ladder and full repayment within tenure
- 50–300 MT/yr band: integrated mushroom project-mode eligibility
- 18×40 ft Series
8 × 18×40 ft + 1 × 30T Compost — 400 kg/day
Eight-room farm upgraded to a 30-tonne compost unit for continuous 10-day filling, delivering 153.6 MT a year. Standard project cost ₹205.28 lakh with a ₹139.9 lakh term loan and 1.84× average DSCR.
- Scale
- 8 Rooms · 18×40 ft
- Daily output
- 400 kg/day
- Annual output
- 153.6 MT/yr
- Compost
- 1 × 30 T on-site
- Standard cost
- ₹205.28 L
- Term loan
- ₹139.9 L
- 10-day batch rhythm with staggered cropping plan
- Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
- Term-loan sizing, DSCR ladder and full repayment within tenure
- 50–300 MT/yr band: integrated mushroom project-mode eligibility
- 18×40 ft Series
10 × 18×40 ft + 1 × 30T Compost — 500 kg/day
Largest 18×40 ft configuration: ten rooms on a 10-day rhythm with one 30-tonne compost unit, 192.0 MT saleable output a year. Standard project cost ₹245.43 lakh, term loan ₹174.7 lakh, average DSCR 1.84×.
- Scale
- 10 Rooms · 18×40 ft
- Daily output
- 500 kg/day
- Annual output
- 192.0 MT/yr
- Compost
- 1 × 30 T on-site
- Standard cost
- ₹245.43 L
- Term loan
- ₹174.7 L
- 10-day batch rhythm with staggered cropping plan
- Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
- Term-loan sizing, DSCR ladder and full repayment within tenure
- 50–300 MT/yr band: integrated mushroom project-mode eligibility
- 18×60 ft Series
2 × 18×60 ft + 1 × 30T Compost — 160 kg/day
Two long-format 18×60 ft rooms with a 30-tonne compost unit on a 15-day rhythm — 60.0 MT a year from a compact footprint. Standard project cost ₹111.53 lakh with a ₹55.4 lakh term loan.
- Scale
- 2 Rooms · 18×60 ft
- Daily output
- 160 kg/day
- Annual output
- 60.0 MT/yr
- Compost
- 1 × 30 T on-site
- Standard cost
- ₹111.53 L
- Term loan
- ₹55.4 L
- 15-day batch rhythm with staggered cropping plan
- Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
- Term-loan sizing, DSCR ladder and full repayment within tenure
- 50–300 MT/yr band: integrated mushroom project-mode eligibility
- 18×60 ft Series
4 × 18×60 ft + 1 × 30T Compost — 320 kg/day
Four 18×60 ft rooms matched to a single 30-tonne compost unit, producing 120.0 MT a year on a 15-day rhythm. Standard project cost ₹155.40 lakh, term loan ₹109.4 lakh.
- Scale
- 4 Rooms · 18×60 ft
- Daily output
- 320 kg/day
- Annual output
- 120.0 MT/yr
- Compost
- 1 × 30 T on-site
- Standard cost
- ₹155.40 L
- Term loan
- ₹109.4 L
- 15-day batch rhythm with staggered cropping plan
- Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
- Term-loan sizing, DSCR ladder and full repayment within tenure
- 50–300 MT/yr band: integrated mushroom project-mode eligibility
- 18×60 ft Series
6 × 18×60 ft + 1 × 30T Compost — 480 kg/day
Six 18×60 ft rooms on a 10-day filling cycle with one 30-tonne compost unit, 180.0 MT saleable a year. Standard project cost ₹199.16 lakh, term loan ₹149.4 lakh, average DSCR 2.04×.
- Scale
- 6 Rooms · 18×60 ft
- Daily output
- 480 kg/day
- Annual output
- 180.0 MT/yr
- Compost
- 1 × 30 T on-site
- Standard cost
- ₹199.16 L
- Term loan
- ₹149.4 L
- 10-day batch rhythm with staggered cropping plan
- Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
- Term-loan sizing, DSCR ladder and full repayment within tenure
- 50–300 MT/yr band: integrated mushroom project-mode eligibility
- 18×60 ft Series
8 × 18×60 ft + 2 × 30T Compost — 640 kg/day
Flagship industrial case: eight 18×60 ft rooms served by two 30-tonne compost units, 240.0 MT saleable output a year. Standard project cost ₹364.35 lakh with a ₹219.5 lakh term loan on a 15-day rhythm.
- Scale
- 8 Rooms · 18×60 ft
- Daily output
- 640 kg/day
- Annual output
- 240.0 MT/yr
- Compost
- 2 × 30 T on-site
- Standard cost
- ₹364.35 L
- Term loan
- ₹219.5 L
- 15-day batch rhythm with staggered cropping plan
- Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
- Term-loan sizing, DSCR ladder and full repayment within tenure
- 50–300 MT/yr band: integrated mushroom project-mode eligibility
- 18×60 ft Series
10 × 18×60 ft + 2 × 30T Compost — 800 kg/day
10 controlled 18×60 ft grow rooms served by 2 × 30 T compost capacity on a 10-day batch rhythm, giving 800 kg/day nominal and 300.0 MT saleable a year. Standard project cost ₹408.99 lakh (₹427.30 lakh with Naayom automation), term loan ₹273.5 lakh, minimum DSCR 1.75× and 1.84× weighted average.
- Scale
- 10 Rooms · 18×60 ft
- Daily output
- 800 kg/day
- Annual output
- 300.0 MT/yr
- Compost
- 2 × 30 T on-site
- Standard cost
- ₹408.99 L
- Term loan
- ₹273.5 L
- 10-day batch rhythm with staggered cropping plan
- Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
- Term-loan sizing, DSCR ladder and full repayment within tenure
- Above 300 MT/yr: large integrated project appraisal route
- 18×60 ft Series
12 × 18×60 ft + 2 × 30T Compost — 960 kg/day
12 controlled 18×60 ft grow rooms served by 2 × 30 T compost capacity on a 10-day batch rhythm, giving 960 kg/day nominal and 360.0 MT saleable a year. Standard project cost ₹455.96 lakh (₹476.83 lakh with Naayom automation), term loan ₹327.6 lakh, minimum DSCR 1.75× and 1.84× weighted average.
- Scale
- 12 Rooms · 18×60 ft
- Daily output
- 960 kg/day
- Annual output
- 360.0 MT/yr
- Compost
- 2 × 30 T on-site
- Standard cost
- ₹455.96 L
- Term loan
- ₹327.6 L
- 10-day batch rhythm with staggered cropping plan
- Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
- Term-loan sizing, DSCR ladder and full repayment within tenure
- Above 300 MT/yr: large integrated project appraisal route
- 18×60 ft Series
16 × 18×60 ft + 3 × 30T Compost — 1280 kg/day
16 controlled 18×60 ft grow rooms served by 3 × 30 T compost capacity on a 10-day batch rhythm, giving 1280 kg/day nominal and 480.0 MT saleable a year. Standard project cost ₹606.13 lakh (₹635.04 lakh with Naayom automation), term loan ₹437.2 lakh, minimum DSCR 1.75× and 1.84× weighted average.
- Scale
- 16 Rooms · 18×60 ft
- Daily output
- 1280 kg/day
- Annual output
- 480.0 MT/yr
- Compost
- 3 × 30 T on-site
- Standard cost
- ₹606.13 L
- Term loan
- ₹437.2 L
- 10-day batch rhythm with staggered cropping plan
- Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
- Term-loan sizing, DSCR ladder and full repayment within tenure
- Above 300 MT/yr: large integrated project appraisal route
- 18×70 ft Series
2 × 18×70 ft + 1 × 30T Compost — 200 kg/day
2 controlled 18×70 ft grow rooms served by 1 × 30 T compost capacity on a 15-day batch rhythm, giving 200 kg/day nominal and 72.0 MT saleable a year. Standard project cost ₹117.51 lakh (₹122.80 lakh with Naayom automation), term loan ₹66.2 lakh, minimum DSCR 1.75× and 1.84× weighted average.
- Scale
- 2 Rooms · 18×70 ft
- Daily output
- 200 kg/day
- Annual output
- 72.0 MT/yr
- Compost
- 1 × 30 T on-site
- Standard cost
- ₹117.51 L
- Term loan
- ₹66.2 L
- 15-day batch rhythm with staggered cropping plan
- Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
- Term-loan sizing, DSCR ladder and full repayment within tenure
- 50–300 MT/yr band: integrated mushroom project-mode eligibility
- 18×70 ft Series
4 × 18×70 ft + 1 × 30T Compost — 400 kg/day
4 controlled 18×70 ft grow rooms served by 1 × 30 T compost capacity on a 15-day batch rhythm, giving 400 kg/day nominal and 144.0 MT saleable a year. Standard project cost ₹167.90 lakh (₹175.74 lakh with Naayom automation), term loan ₹125.9 lakh, minimum DSCR 1.75× and 1.92× weighted average.
- Scale
- 4 Rooms · 18×70 ft
- Daily output
- 400 kg/day
- Annual output
- 144.0 MT/yr
- Compost
- 1 × 30 T on-site
- Standard cost
- ₹167.90 L
- Term loan
- ₹125.9 L
- 15-day batch rhythm with staggered cropping plan
- Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
- Term-loan sizing, DSCR ladder and full repayment within tenure
- 50–300 MT/yr band: integrated mushroom project-mode eligibility
- 18×70 ft Series
6 × 18×70 ft + 1 × 30T Compost — 600 kg/day
6 controlled 18×70 ft grow rooms served by 1 × 30 T compost capacity on a 10-day batch rhythm, giving 600 kg/day nominal and 216.0 MT saleable a year. Standard project cost ₹269.73 lakh (₹280.16 lakh with Naayom automation), term loan ₹196.8 lakh, minimum DSCR 1.75× and 1.84× weighted average.
- Scale
- 6 Rooms · 18×70 ft
- Daily output
- 600 kg/day
- Annual output
- 216.0 MT/yr
- Compost
- 1 × 30 T on-site
- Standard cost
- ₹269.73 L
- Term loan
- ₹196.8 L
- 10-day batch rhythm with staggered cropping plan
- Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
- Term-loan sizing, DSCR ladder and full repayment within tenure
- 50–300 MT/yr band: integrated mushroom project-mode eligibility
- 18×70 ft Series
8 × 18×70 ft + 2 × 30T Compost — 800 kg/day
8 controlled 18×70 ft grow rooms served by 2 × 30 T compost capacity on a 15-day batch rhythm, giving 800 kg/day nominal and 288.0 MT saleable a year. Standard project cost ₹392.52 lakh (₹408.25 lakh with Naayom automation), term loan ₹262.6 lakh, minimum DSCR 1.75× and 1.84× weighted average.
- Scale
- 8 Rooms · 18×70 ft
- Daily output
- 800 kg/day
- Annual output
- 288.0 MT/yr
- Compost
- 2 × 30 T on-site
- Standard cost
- ₹392.52 L
- Term loan
- ₹262.6 L
- 15-day batch rhythm with staggered cropping plan
- Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
- Term-loan sizing, DSCR ladder and full repayment within tenure
- 50–300 MT/yr band: integrated mushroom project-mode eligibility
- 18×70 ft Series
10 × 18×70 ft + 2 × 30T Compost — 1000 kg/day
10 controlled 18×70 ft grow rooms served by 2 × 30 T compost capacity on a 10-day batch rhythm, giving 1000 kg/day nominal and 360.0 MT saleable a year. Standard project cost ₹443.57 lakh (₹461.87 lakh with Naayom automation), term loan ₹327.5 lakh, minimum DSCR 1.75× and 1.84× weighted average.
- Scale
- 10 Rooms · 18×70 ft
- Daily output
- 1000 kg/day
- Annual output
- 360.0 MT/yr
- Compost
- 2 × 30 T on-site
- Standard cost
- ₹443.57 L
- Term loan
- ₹327.5 L
- 10-day batch rhythm with staggered cropping plan
- Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
- Term-loan sizing, DSCR ladder and full repayment within tenure
- Above 300 MT/yr: large integrated project appraisal route
- 18×70 ft Series
12 × 18×70 ft + 2 × 30T Compost — 1200 kg/day
12 controlled 18×70 ft grow rooms served by 2 × 30 T compost capacity on a 10-day batch rhythm, giving 1200 kg/day nominal and 432.0 MT saleable a year. Standard project cost ₹525.55 lakh (₹546.54 lakh with Naayom automation), term loan ₹393.1 lakh, minimum DSCR 1.75× and 1.84× weighted average.
- Scale
- 12 Rooms · 18×70 ft
- Daily output
- 1200 kg/day
- Annual output
- 432.0 MT/yr
- Compost
- 2 × 30 T on-site
- Standard cost
- ₹525.55 L
- Term loan
- ₹393.1 L
- 10-day batch rhythm with staggered cropping plan
- Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
- Term-loan sizing, DSCR ladder and full repayment within tenure
- Above 300 MT/yr: large integrated project appraisal route
- 18×70 ft Series
16 × 18×70 ft + 3 × 30T Compost — 1600 kg/day
16 controlled 18×70 ft grow rooms served by 3 × 30 T compost capacity on a 10-day batch rhythm, giving 1600 kg/day nominal and 576.0 MT saleable a year. Standard project cost ₹685.49 lakh (₹714.40 lakh with Naayom automation), term loan ₹514.1 lakh, minimum DSCR 1.75× and 1.88× weighted average.
- Scale
- 16 Rooms · 18×70 ft
- Daily output
- 1600 kg/day
- Annual output
- 576.0 MT/yr
- Compost
- 3 × 30 T on-site
- Standard cost
- ₹685.49 L
- Term loan
- ₹514.1 L
- 10-day batch rhythm with staggered cropping plan
- Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
- Term-loan sizing, DSCR ladder and full repayment within tenure
- Above 300 MT/yr: large integrated project appraisal route
- 18×70 ft Series
20 × 18×70 ft + 4 × 30T Compost — 2000 kg/day
Largest model in the library: twenty 18×70 ft controlled rooms served by four 30-tonne compost units on a 10-day batch rhythm, giving 2000 kg/day nominal and 720.0 MT saleable a year. Standard project cost ₹826.39 lakh (₹863.21 lakh with Naayom automation), term loan ₹619.8 lakh, minimum DSCR 1.75× and 1.96× weighted average.
- Scale
- 20 Rooms · 18×70 ft
- Daily output
- 2000 kg/day
- Annual output
- 720.0 MT/yr
- Compost
- 4 × 30 T on-site
- Standard cost
- ₹826.39 L
- Term loan
- ₹619.8 L
- 10-day batch rhythm with staggered cropping plan
- Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
- Term-loan sizing, DSCR ladder and full repayment within tenure
- Above 300 MT/yr: large integrated project appraisal route
Sample reports are published for study and reference only. Their BOQs were built on MushroomWale quotation rates of 10 Oct 2026; every loan is sized so the DSCR never falls below 1.75×, which is why each card shows that minimum. Costs, yields and returns vary with site, capacity, brand selection and current market rates. GST 18% and transportation are extra, and any additional client requirement is treated as extra scope.
How to download a sample mushroom DPR
Four steps, about three minutes — no login needed.
Search the DPR Bank
Type a room size, capacity, project cost or report code — for example “18×60”, “400 kg” or “without compost” — into the search box to shortlist matching reports.
Filter by category, project type and capacity
Narrow the library by series (18×40, 18×60, 18×70 ft or Master Portfolio), by project type (on-site compost unit or bought-in compost) and by daily capacity band.
Select the reports you need
Tick one or more dossiers, or use Select all shown to take an entire filtered set in a single request.
Submit the request form and download
Share your name, WhatsApp number, email, address and purpose once. The selected DPR PDFs download immediately and our project team can help you shape a bankable DPR for your own site.
Sample DPR Bank — Frequently Asked Questions

Need a bankable DPR for your own project?
CA-style DPR with BOQ, 5-year P&L, cash-flow, DSCR and subsidy mapping — delivered in 7–14 days.