What does it take to build a commercial mushroom farm?

A commercial mushroom farm is a cluster of insulated, climate-controlled grow rooms on a raised RCC plinth. Each room is a hot-dip galvanised MS portal frame clad with 60 mm PPGL PUF wall panels and 80 mm PPGL roof panels, fitted with a 6–12 TR refrigeration and fresh-air system, a double-door airlock, 32-mesh screened intakes and a washable sloped floor. Sized correctly, each square metre of bed area yields 18–22 kg of button mushrooms per cycle across 5–6 cycles a year. Civil and boundary work are typically client scope; the panels, structure, machinery and controls are delivered turnkey.

Grow Room Sizes, Bed Area & Yield

Room sizeFloor areaBed area (7-tier)YieldRefrigeration
18×30 ft540 ft²7-tier rack, ~150 m² bed area18–22 kg/m²/cycle6 TR (72,000 BTU)
18×40 ft720 ft²7-tier rack, ~210 m² bed area18–22 kg/m²/cycle8 TR (96,000 BTU)
18×60 ft1,080 ft²7-tier rack, ~320 m² bed area18–22 kg/m²/cycle10 TR (120,000 BTU)
18×70 ft1,260 ft²7-tier rack, ~380 m² bed area18–22 kg/m²/cycle12 TR (144,000 BTU)

Yield figures are approximate, based on Phase-2 compost at 20–25% biological efficiency and tight climate control (16–18 °C in cropping, 85–90% RH). Actual output varies with compost, spawn and operations.

Material Specifications

Wall PUF panel

Spec: 60 mm thickness, PPGL coating both faces (never PPGI), density 40 ±2 kg/m³

Why: Holds 16–18 °C against 40 °C+ Indian summers with minimum compressor load

Roof PUF panel

Spec: 80 mm thickness, PPGL coated, with internal gutter slope

Why: Roof gets maximum solar gain — thicker core stops heat ingress and condensation drip

Flooring

Spec: RCC with 1:100 slope to drain, epoxy or anti-skid finish

Why: Daily washdown, drainage of casing water, and hygienic cook-out

Doors

Spec: Insulated PUF flush doors with airlock lobby, magnetic gasket seal

Why: Stops temperature loss and fly ingress between rooms

Structure

Spec: MS / GI hot-dip galvanised portal frame, anti-corrosion primer

Why: Carries panel + rack load in a permanently humid (85–95% RH) environment

Engineering Systems

Refrigeration & Air

6–12 TR per room sized on heat load, with fresh-air handling and CO₂ exhaust to hold 16–18 °C and 85–90% RH year-round.

Power & Backup

Stabilised supply with DG backup sized for compressor starting surge so climate never breaks during outages.

Water & Drainage

Clean water supply plus a 1:100 sloped, trapped floor drain connected to a soak pit or ETP for daily washdown and cook-out.

Eight-Point Construction Checklist

Level, compacted plinth raised 300–450 mm above ground to prevent flooding.
Galvanised MS portal frame designed for panel dead load + 7-tier rack live load + wind.
60 mm PPGL wall panels, 80 mm PPGL roof panels — sealed joints, no thermal bridges.
Double-door airlock lobby at every grow-room entrance for biosecurity.
RCC floor with 1:100 drainage slope and trapped gully connected to a soak/ETP.
Refrigeration sized per room (6–12 TR) with fresh-air handling and CO₂ exhaust.
32-mesh insect screen on every fresh-air intake; sealed cable and pipe penetrations.
Dedicated DG backup and stabilised power for compressors and air handlers.

Civil works (plinth, RCC floor, boundary) are typically in the client's scope. GST @ 18% and transport are extra. Get heat-load and electrical sizing finalised before ordering panels.

Frequently Asked Questions

The company behind the build

Why Choose MushroomWale

  1. 01

    Engineering Expertise

    Agrimotion Engineering Private Limited is a registered EPC company (CIN U43900UP2023PTC185328, GSTIN 09AAZCA0158R1ZP) based in Firozabad, Uttar Pradesh.

  2. 02

    Proven Track Record

    Turnkey mushroom projects from a 2-room starter to a 20-room commercial farm.

  3. 03

    Bank-Recognized DPRs

    Bank-format DPRs prepared to NABARD, NHB and MIDH norms for loan and subsidy applications.

A MushroomWale grow room in crop, bags on every tier
Start your project

Building a mushroom farm? Get the structure right the first time

MushroomWale delivers turnkey grow rooms with PPGL PUF panels, galvanised structure, sized refrigeration and biosecure airlocks — engineered for 18–22 kg/m² yields across 5–6 cycles a year.

  • Turnkey farms built
  • Pan-India delivery
  • Bank-ready DPR