Master Portfolio
Master Portfolio — All 21 Project Configurations Compared
The single comparison volume: all 21 MushroomWale project configurations (18×40, 18×60 and 18×70 ft, with 20T/30T compost units or bought-in compost) placed side by side across 65 pages — 42 standard plus automated cases, debt sized to cash flow with a 1.50× internal DSCR floor and nil base subsidy assumed. Start here to pick the model that fits your land, capital and market before opening an individual DPR.

- 65 pages
- 10 Oct 2026
- Daily output
- 100 – 2000 kg/day
- Annual output
- 38.4 – 720.0 MT/yr
- Standard cost
- ₹56.26 L – ₹826.39 L
- Term loan
- Sized at 75% CFADS
Report specification
- Project scale
- 21 Configurations · Comparative
- Nominal daily output
- 100 – 2000 kg/day
- Saleable annual output
- 38.4 – 720.0 MT/yr
- Compost arrangement
- 20T / 30T on-site or bought-in
- Standard project cost
- ₹56.26 L – ₹826.39 L
- Automation option cost
- 42 standard + automated cases
- Model-selected term loan
- Sized at 75% CFADS
- DSCR
- 1.50× internal floor
- Report code
- MW-DPR-MASTER-2026-R8
- Pages
- 65 pages
- Category
- Master Portfolio
- Last updated
- 10 Oct 2026
What this report covers
- Project concept, promoter background and market note
- Grow-room and compost-unit engineering with room-wise BOQ
- Civil, PUF, racking, HVAC and electrical cost build-up
- Working-capital cycle and batch-wise production schedule
- 5-year projected P&L, cash flow and balance sheet
- Term-loan sizing, repayment ladder and DSCR statement
- Subsidy / scheme note in a client-editable format
- Risk analysis, sensitivity cases and annexures
Model highlights
- Every configuration compared on cost, output, loan and DSCR
- Standard vs Naayom automated case for each model
- Pan-India client-editable scheme draft included
- Best first read before choosing a specific room size
Download “Master Portfolio — All 21 Project Configurations Compared”
65-page PDF · MW-DPR-MASTER-2026-R8 · free for study and bank discussion.
Sample reports are published for study and reference only. Costs, yields and returns vary with site, capacity, brand selection and current market rates. GST 18% and transportation are extra, and any additional client requirement is treated as extra scope.
