Without Compost Unit

2 × 18×40 ft — 100 kg/day, Bought-In Compost

Lightest entry model: two 18×40 ft controlled rooms running on externally procured Phase-III compost, so no composting yard is funded. Standard project cost ₹56.26 lakh with a ₹19.0 lakh term loan and 1.84× average DSCR.

Back to all 22 reports
No login needed — share your contact once and the PDF downloads instantly.
Cover page of the 2 × 18×40 ft — 100 kg/day, Bought-In Compost sample mushroom farming DPR
  • 80 pages
  • PDF
  • 10 Oct 2026
Daily output
100 kg/day
Annual output
38.4 MT/yr
Standard cost
₹56.26 L
Term loan
₹19.0 L

Report specification

Project scale
2 Rooms · 18×40 ft
Nominal daily output
100 kg/day
Saleable annual output
38.4 MT/yr
Compost arrangement
Externally procured
Standard project cost
₹56.26 L
Automation option cost
₹58.82 L
Model-selected term loan
₹19.0 L
DSCR
1.75× min · 1.84× avg
Report code
MW-40-2-NC-2026-R8
Pages
80 pages
Category
Without Compost Unit
Last updated
10 Oct 2026

What this report covers

  1. Project concept, promoter background and market note
  2. Grow-room and compost-unit engineering with room-wise BOQ
  3. Civil, PUF, racking, HVAC and electrical cost build-up
  4. Working-capital cycle and batch-wise production schedule
  5. 5-year projected P&L, cash flow and balance sheet
  6. Term-loan sizing, repayment ladder and DSCR statement
  7. Subsidy / scheme note in a client-editable format
  8. Risk analysis, sensitivity cases and annexures

Model highlights

  • Lowest capex route — compost bought per cycle
  • Below 50 MT/yr: confirm state small-unit scheme component
  • Term loan ₹19.0 L, repaid within tenure
  • Land, grid connection, DG and transport excluded

Download “2 × 18×40 ft — 100 kg/day, Bought-In Compost”

80-page PDF · MW-40-2-NC-2026-R8 · free for study and bank discussion.

Sample reports are published for study and reference only. Costs, yields and returns vary with site, capacity, brand selection and current market rates. GST 18% and transportation are extra, and any additional client requirement is treated as extra scope.