18×40 ft Series

2 × 18×40 ft + 1 × 20T Compost — 100 kg/day

Self-reliant starter farm: two 18×40 ft rooms plus one 20-tonne compost unit on a 15-day batch rhythm. Standard project cost ₹94.66 lakh (₹99.94 lakh automated) against 38.4 MT saleable output a year.

Back to all 22 reports
No login needed — share your contact once and the PDF downloads instantly.
Cover page of the 2 × 18×40 ft + 1 × 20T Compost — 100 kg/day sample mushroom farming DPR
  • 80 pages
  • PDF
  • 10 Oct 2026
Daily output
100 kg/day
Annual output
38.4 MT/yr
Standard cost
₹94.66 L
Term loan
₹35.8 L

Report specification

Project scale
2 Rooms · 18×40 ft
Nominal daily output
100 kg/day
Saleable annual output
38.4 MT/yr
Compost arrangement
1 × 20 T on-site
Standard project cost
₹94.66 L
Automation option cost
₹99.94 L
Model-selected term loan
₹35.8 L
DSCR
1.75× min · 1.84× avg
Report code
MW-40-2-C20-2026-R8
Pages
80 pages
Category
18×40 ft Series
Last updated
10 Oct 2026

What this report covers

  1. Project concept, promoter background and market note
  2. Grow-room and compost-unit engineering with room-wise BOQ
  3. Civil, PUF, racking, HVAC and electrical cost build-up
  4. Working-capital cycle and batch-wise production schedule
  5. 5-year projected P&L, cash flow and balance sheet
  6. Term-loan sizing, repayment ladder and DSCR statement
  7. Subsidy / scheme note in a client-editable format
  8. Risk analysis, sensitivity cases and annexures

Model highlights

  • 15-day batch rhythm with staggered cropping plan
  • Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
  • Term-loan sizing, DSCR ladder and full repayment within tenure
  • Below 50 MT/yr: confirm state small/production-unit component

Download “2 × 18×40 ft + 1 × 20T Compost — 100 kg/day”

80-page PDF · MW-40-2-C20-2026-R8 · free for study and bank discussion.

Sample reports are published for study and reference only. Costs, yields and returns vary with site, capacity, brand selection and current market rates. GST 18% and transportation are extra, and any additional client requirement is treated as extra scope.