18×40 ft Series

4 × 18×40 ft + 1 × 20T Compost — 200 kg/day

Four-room commercial unit fed by one 20-tonne compost bunker, 76.8 MT saleable output a year on a 15-day batch rhythm. Standard project cost ₹127.46 lakh with a ₹70.5 lakh model-selected term loan.

Back to all 22 reports
No login needed — share your contact once and the PDF downloads instantly.
Cover page of the 4 × 18×40 ft + 1 × 20T Compost — 200 kg/day sample mushroom farming DPR
  • 80 pages
  • PDF
  • 10 Oct 2026
Daily output
200 kg/day
Annual output
76.8 MT/yr
Standard cost
₹127.46 L
Term loan
₹70.5 L

Report specification

Project scale
4 Rooms · 18×40 ft
Nominal daily output
200 kg/day
Saleable annual output
76.8 MT/yr
Compost arrangement
1 × 20 T on-site
Standard project cost
₹127.46 L
Automation option cost
₹135.30 L
Model-selected term loan
₹70.5 L
DSCR
1.75× min · 1.84× avg
Report code
MW-40-4-C20-2026-R8
Pages
80 pages
Category
18×40 ft Series
Last updated
10 Oct 2026

What this report covers

  1. Project concept, promoter background and market note
  2. Grow-room and compost-unit engineering with room-wise BOQ
  3. Civil, PUF, racking, HVAC and electrical cost build-up
  4. Working-capital cycle and batch-wise production schedule
  5. 5-year projected P&L, cash flow and balance sheet
  6. Term-loan sizing, repayment ladder and DSCR statement
  7. Subsidy / scheme note in a client-editable format
  8. Risk analysis, sensitivity cases and annexures

Model highlights

  • 15-day batch rhythm with staggered cropping plan
  • Room + compost BOQ from MushroomWale rate card v2.92 (10 Oct 2026)
  • Term-loan sizing, DSCR ladder and full repayment within tenure
  • 50–300 MT/yr band: integrated mushroom project-mode eligibility

Download “4 × 18×40 ft + 1 × 20T Compost — 200 kg/day”

80-page PDF · MW-40-4-C20-2026-R8 · free for study and bank discussion.

Sample reports are published for study and reference only. Costs, yields and returns vary with site, capacity, brand selection and current market rates. GST 18% and transportation are extra, and any additional client requirement is treated as extra scope.