Phase-2 Pasteurization Tunnels for Mushroom Farms
PUF-insulated pasteurization tunnels with steam boiler, plenum airflow, and digital controllers. Precision 58-62°C pasteurization for contamination-free Agaricus bisporus compost. From ₹8 lakhs for single tunnel.
What Is a Phase-2 Pasteurization Tunnel?
A Phase-2 pasteurization tunnel is an insulated chamber equipped with steam injection and air handling systems that heat mushroom compost to 58-62°C for 6-8 hours (killing pathogens and competitor molds), then condition it at 48-52°C for 5-7 days to promote beneficial thermophilic microorganisms. This produces clean, selective substrate ready for spawning.
Why Pasteurization Is Non-Negotiable
ICAR-DMR research confirms that unpasteurized compost leads to 50-80% crop failure from Trichoderma green mold, nematodes, and competitor fungi. A proper Phase-2 tunnel ensures selective compost with 10× lower contamination risk compared to room pasteurization.
What's Inside a MushroomWale Phase-2 Tunnel
PUF Insulated Walls
80-100mm PPGL PUF panels for thermal efficiency. Maintains 58-62°C with minimal steam loss.
Plenum Air System
Under-floor grated plenum ensures uniform airflow through the compost mass for even pasteurization.
Steam Boiler System
500-1000 kg/hr boiler with precise steam injection for rapid temperature ramp-up.
Complete compost infrastructureDigital Controls
Multi-zone temperature monitoring with 6-8 probes. Optional PLC automation for hands-free operation.
Recirculation AHU
Air handling unit with dampers for precise fresh air:recirculation ratio control during conditioning.
Commissioning & Training
Complete testing, first-batch supervision, and operator training on pasteurization protocols.
Phase-2 Tunnel BOQ Checklist
Phase-2 Tunnel Setup Cost (2026)
| Size | Cost | Yield | Payback |
|---|---|---|---|
| Single tunnel (15-20T) | ₹8-15 Lakh | Serves 4-6 rooms | Consistent compost quality |
| Dual tunnel setup | ₹15-25 Lakh | Serves 8-12 rooms | Continuous supply |
| Large-scale (40T+) | ₹25-40 Lakh | Serves 15-20 rooms | Commercial compost sales |
| Phase-3 integrated | ₹30-50 Lakh | Spawn-run included | Maximum efficiency |
* Costs exclude civil work, land, and GST @18%. Steam boiler fuel costs vary by region.
Case Study
Dual Phase-2 Tunnel — Agra, UP
The Phase-2 tunnels transformed our operation. Contamination dropped from 15% to under 2%, and compost quality became completely consistent batch after batch.View all projects →
Phase-2 Tunnel FAQ
Why Choose MushroomWale
Engineering Expertise
Agrimotion Engineering Private Limited is a registered EPC company (CIN U43900UP2023PTC185328, GSTIN 09AAZCA0158R1ZP) based in Firozabad, Uttar Pradesh.
Proven Track Record
Turnkey mushroom projects from 6-room starters to 30-room commercial facilities.
Bank-Recognized DPRs
Bank-format DPRs prepared to NABARD, NHB and MIDH norms for loan and subsidy applications.
Explore Other Services
DPR, Subsidy & Training for Your Phase-II Pasteurization Tunnels Project
Every MushroomWale project ships with a NABARD-compliant DPR and access to our hands-on training curriculum — so you're farm-ready from Day 1.
Bankable DPR & Subsidy Filing
- NABARD / NHB / MIDH / PMEGP compliant format
- Itemized BOQ, cash-flow & break-even analysis
- State-specific subsidy mapping (35-50%)
- Bank loan submission support
15-Module Hands-On Training
- Composting (Phase I & Phase II) protocols
- Spawning, casing & cropping practice
- Climate control, IPM & post-harvest
- Based on ICAR-DMR Solan curriculum
Get your Phase-II Pasteurization Tunnels quote + DPR within 24 hours
Free site evaluation · GST 18% & transport extra · 5-day quote validity
Related Mushroom Services
Explore the connected infrastructure and financing that make up a complete turnkey mushroom project across India.
Ready to Build Your Pasteurization Tunnel?
Get custom tunnel design and complete EPC setup. Free site survey available.
