The rack corridor of a finished MushroomWale grow room, before filling
18×60 ft

18×60 ft Button Mushroom Room

Commercial operators planning consistent supply to wholesale, retail, and institutional buyers.

Planning Points

  1. Indicative capacity: ~2,500 bags per cycle, ~5,000 kg per cycle, ~83 kg/day
  2. Cooling: Daikin 10 TR (4 HP R32 + 6 HP R410A outdoor) + dual-circuit HMT evaporator; Carrier option available
  3. 2 PUF flash doors for cleaner crop-flow and worker movement
  4. Best planned as part of a multi-room production schedule
  5. Compost planning becomes critical at this scale

What Drives the Cost

  1. PUF panel and structural scope
  2. Rack system and tier density
  3. Cooling and air distribution engineering
  4. Power backup sizing
  5. Compost unit scope if self-made

Get an accurate project quotation

Costs depend on your site, scope, and market. Talk to the team or generate a detailed quotation tailored to this model.