RECOMMENDED MODEL

3000-Bag Compost Unit

14×40 System – Complete Phase-I + Phase-II composting infrastructure for Indian conditions up to 50°C ambient.

3,000Bags/Cycle
30 tonPer Cycle
60 tonMonthly
15 daysCycle

14×40 ft Compost Unit Airflow

TUNNEL14' × 40'8" HDPE MANIFOLDBLOWER10 HPTTTBUNKER 1BUNKER 25HP5HP8" HDPE Manifold4" PVC PipesTemp Sensor
Capacity
3,000 bags
Per Cycle
30 ton
Blowers
5/5/10 HP
14×40 System

Complete Specifications

Core Chambers

Bunker 1
14 ft × 40 ft
Bunker 2
14 ft × 40 ft
Closed Tunnel
14 ft × 40 ft

Supporting Areas

Wetting & Mixing Slab
45 ft × 70 ft
Slope
4 in over the 70 ft slab

Capacity (Locked Values)

Bags per cycle
3,000
Bag weight
10 kg
Cycle duration
15 days
Tons per cycle
30 ton
Cycles per month
2
Monthly output
60 ton
Daily equivalent
2 ton/day

Blowers (Exact Ratings)

Bunker Blower 1
5 HP
Bunker Blower 2
5 HP
Tunnel Blower
10 HP
Air

Air & Aeration System

Main Manifold

8 inch HDPE polymer pipe

Under-floor Distribution

4 inch PVC pipes embedded in RCC

Reducers

8 inch → 4 inch

Spigot Piping

PVC perforated pipes inside bunkers

Important: Holes drilled AFTER RCC construction only
Production cycle

Phase-I + Phase-II Cycle Timeline

Day 0–3

Pre-wetting

Initial moisture treatment of raw materials

Day 3–9

Phase I (Bunkers)

Turning Day 3, 5, 7 | Core: 70–78°C | Moisture: 68–72%

Day 9–15

Phase II (Tunnel)

Pasteurize: 58–60°C | Condition: 45–50°C | Exit ammonia: under 10 ppm

Day 15–16

Cool-down & Bagging

Spawning start | Movement to grow rooms

Ours

Scope of Supply

Structural

  • RCC civil works
  • Bunker 1 & 2 construction
  • Closed tunnel construction
  • Mixing yard preparation
  • Pre-wet slab with slope
  • Drainage system
  • Loader access pathway

Mechanical

  • Bunker blowers (as per model)
  • Tunnel blower
  • Dampers & louvers
  • Insulated ducts
  • Spigot piping system
  • Under-floor PVC pipes (4 inch)
  • 8 inch HDPE main manifold

Electrical

  • Main distribution panel
  • Contactors
  • MCB/ELCB protection
  • 1 mm sensor wiring
  • 1.5 mm control wiring
  • 4 mm motor wiring

Controls

  • IoT controller
  • Temperature sensors
  • Phase-I & II automation programs
  • Ammonia sequence logic
  • Runtime logging
  • Remote monitoring with alerts
Yours

Civil Requirements

Client to provide before installation:

  1. 1RCC floor 6–8 inches
  2. 2Drain trench 8–12 inch
  3. 3Wetting slab sloped 2 in (20 T) / 4 in (30 T) along its length
  4. 4Condensate drain inside tunnel
  5. 5Loader pathway
  6. 6Anti-skid broom finish
Options

Optional Upgrades

Additional Sensors
Extra temperature monitoring points
Advanced IoT Dashboard
Mobile app with analytics
Backup Power
Generator integration for blowers
CCTV Integration
Remote visual monitoring
Automated Turning
Mechanical turning assistance
Next step

Get a Custom Quote for 3000-Bag Compost Unit

Our team will prepare a detailed quotation including all specifications, civil requirements, and installation timeline.

Get Custom Quote

Compost unit FAQs