MushroomWale - Turnkey Mushroom Project Solutions
    You're offline — cached content is available
    Back to All Compost Units

    2000-Bag Compost Unit

    14×30 System – Complete Phase-I + Phase-II composting infrastructure for Indian conditions up to 50°C ambient.

    2,000
    Bags/Cycle
    20 ton
    Per Cycle
    40 ton
    Monthly
    15 days
    Cycle

    14×30 ft Compost Unit Airflow

    TUNNEL14' × 30'8" HDPE MANIFOLDBLOWER7.5 HPTTTBUNKER 1BUNKER 23.5HP3.5HP8" HDPE Manifold4" PVC PipesTemp Sensor
    Capacity
    2,000 bags
    Per Cycle
    20 ton
    Blowers
    3.5/3.5/7.5 HP

    Complete Specifications

    Core Chambers

    Bunker 114 ft × 30 ft
    Bunker 214 ft × 30 ft
    Closed Tunnel14 ft × 30 ft

    Supporting Areas

    Mixing Area45 ft × 60 ft
    Pre-wet Area30 ft × 40 ft
    Slope3 ft over 40 ft (7.5%)

    Capacity (Locked Values)

    Bags per cycle2,000
    Bag weight10 kg
    Cycle duration15 days
    Tons per cycle20 ton
    Cycles per month2
    Monthly output40 ton
    Daily equivalent1.33 ton/day

    Blowers (Exact Ratings)

    Bunker Blower 13.5 HP
    Bunker Blower 23.5 HP
    Tunnel Blower7.5 HP

    Air & Aeration System

    Main Manifold

    8 inch HDPE polymer pipe

    Under-floor Distribution

    4 inch PVC pipes embedded in RCC

    Reducers

    8 inch → 4 inch

    Spigot Piping

    PVC perforated pipes inside bunkers

    Important: Holes drilled AFTER RCC construction only

    Phase-I + Phase-II Cycle Timeline

    Day 0–3

    Pre-wetting

    Initial moisture treatment of raw materials

    Day 3–9

    Phase I (Bunkers)

    Turning Day 3, 5, 7 | Core: 63–70°C | Moisture: 68–72%

    Day 9–15

    Phase II (Tunnel)

    Pasteurize: 57–60°C | Condition: 45–50°C | Exit ammonia: zero

    Day 15–16

    Cool-down & Bagging

    Spawning start | Movement to grow rooms

    Scope of Supply

    Structural

    • RCC civil works
    • Bunker 1 & 2 construction
    • Closed tunnel construction
    • Mixing yard preparation
    • Pre-wet slab with slope
    • Drainage system
    • Loader access pathway

    Mechanical

    • Bunker blowers (as per model)
    • Tunnel blower
    • Dampers & louvers
    • Insulated ducts
    • Spigot piping system
    • Under-floor PVC pipes (4 inch)
    • 8 inch HDPE main manifold

    Electrical

    • Main distribution panel
    • Contactors
    • MCB/ELCB protection
    • 1 mm sensor wiring
    • 1.5 mm control wiring
    • 4 mm motor wiring

    Controls

    • IoT controller
    • Temperature sensors
    • Phase-I & II automation programs
    • Ammonia sequence logic
    • Runtime logging
    • Remote monitoring with alerts

    Civil Requirements

    Client to provide before installation:

    • 1
      RCC floor 6–8 inches
    • 2
      Drain trench 8–12 inch
    • 3
      Pre-wet slope 3 ft across length
    • 4
      Condensate drain inside tunnel
    • 5
      Loader pathway
    • 6
      Anti-skid broom finish

    Optional Upgrades

    Additional Sensors
    Extra temperature monitoring points
    Advanced IoT Dashboard
    Mobile app with analytics
    Backup Power
    Generator integration for blowers
    CCTV Integration
    Remote visual monitoring
    Automated Turning
    Mechanical turning assistance

    Get a Custom Quote for 2000-Bag Compost Unit

    Our team will prepare a detailed quotation including all specifications, civil requirements, and installation timeline.

    Get Custom Quote